+49 (0) 2129 376-200 This email address is being protected from spambots. You need JavaScript enabled to view it.

Select your language

INDUSTRIAL FLASH STORAGE · MARKET CHANGE 2024–2026

THE MLC MARKET
CHANGE.
 ACT NOW.

eMMC and microSD based on MLC in 4 GB and 8 GB are approaching end-of-life. Those who do not plan today risk production losses and costly redesigns tomorrow.

⚠ MARKET WARNING: MLC-BASED EMMC & MICROSD WITH 4 GB / 8 GB WILL BE STOPPED SHORTLY – MINIMUM CAPACITY WILL RISE TO 64 GB

PROBLEM MANALYSIS

WHAT ON YOUR COMPANY
COMING

Millions of industrial systems – from control units and gateways to embedded computers – are based on MLC-eMMC and microSD with 4 GB or 8 GB. These components were the reliable choice for years: cost-effective, long-term available, tested. But the market is turning. Manufacturers stop producing small capacities. The new lower limit is 64 GB – a factor that affects far more than just memory.

4 / 8 GB
PREVIOUS STANDARD

fas fa-arrow-right

64 GB +
NEW MINIMUM

CAPACITY CONFLICTS

Existing software, partition tables and production images are designed for small capacities. A shift to 64 GB+ requires profound adjustments at the system level.

SUPPLY CHAIN RISK

EOL announcements create storage and bottleneck risks. Those who react too late can find themselves in a situation with rising spot prices and uncertain availability.

COST PRESSURE

Greater capacity means higher unit prices. Without a targeted negotiation and procurement strategy, incalculable additional costs are incurred – especially for large quantities.

TIME PRESSURE

Industrial product cycles often run for 10-15 years. A component change in the middle of the product life cycle is not an option – it must be carefully planned and validated.

HARDWARE REDESIGN

Different form factors, pin assignments or electrical specifications may require a complete PCB redesign – an expensive and time-consuming undertaking.

QUALIFICATION EFFORT

In regulated industries (automotive, medicine, railway technology), every component change means complex re-qualifications and, if necessary, new certifications.

OUR PERFORMANCE PROMISE

WE ACCOMPANY YOU
THROUGH THE CHANGE

The transition from small MLC capacities to the new generation of markets does not have to be a crisis – if it is tackled in time and with the right partner. We take on the technical and logistical complexity so that you can concentrate on your core business.

DESIGN-IN SUPPORT

Existing software, partition tables and production images are designed for small capacities. A shift to 64 GB+ requires profound adjustments at the system level.

LOGISTICS MANAGEMENT

From single samples for qualification to series delivery: We manage your complete supply chain setup – with defined delivery windows and flexibility in terms of retrieval quantities.

OBSOLESCENCE MANAGEMENT

We actively monitor EOL announcements from all relevant manufacturers, deliver last-time buy recommendations at an early stage and develop long-term procurement

QUALIFICATION SUPPORT

We provide samples, technical specifications and manufacturer documentation for your qualification process and coordinate directly with the manufacturer on request.

BUFFER BEARINGS & CONSIGNATION

Through dedicated storage capacities and consignment models, we ensure your production continuity – even over several years. You call when you need to.

STRATEGIC CONSULTING

Together, we develop a roadmap that balances technical requirements, cost objectives and availability security – tailored to your product life cycle.

“We ensure that a market break does not bring your product to a standstill – but you emerge stronger from it.”

TARGET GROUP BENEFIT

WHAT DOES THAT MEAN
 FOR YOUR TEAM?

FOR DEVELOPERS & HARDWARE ENGINEERS

→ Validated drop-in alternatives without complex new development

→ Technical support for compatibility issues and benchmarking

→ Patterns and Datasheets for fast evaluation cycles

→ Early information on market changes and EOL status

FOR SHOPPING & SUPPLY CHAIN

→ Planning security through buffer storage and consignment models

→ Cost transparency and stable price conditions over several years

→ Reduced risk in last-time buys through structured planning

→ A contact for technical and commercial issues

NOW IS THE RIGHT TIME TO ACT

TALK TO OUR EXPERTS NOW.

The sooner you start the transition, the more scope there is for technical validation, building up stock and locking in costs. Waiting costs money – planning saves it.